Abstract color swatches and geometric printed shapes on a desk.
Reused AI-generated editorial illustration; illustrative, not a real transaction.

Before a print-on-demand design is sent to production, agree on exactly which file and which preview are being reviewed. A short approval record helps separate a draft from a final instruction and gives everyone a way to identify the version that was approved.

Side Hustle Nation includes print-on-demand designs among its business ideas. This checklist addresses a narrower problem: documenting a proof and its unresolved questions. It is not a review of a provider or a guarantee that an item will print as expected.

Identify the product and the file

Write down the product variant, design file name, revision, and the date the proof was created. Include the specific provider template or instructions used, if available, and a link to the current proof that the reviewer can access. If a product has multiple sides or placements, identify each one separately.

Confirm who has authority to approve the design and who can request a revision. A comment in a group chat is not necessarily an approval; agree on how a final decision will be recorded before the deadline.

Check the content, not just the appearance

Read the text in the proof for spelling, dates, names, and punctuation. Verify that the displayed design is the intended revision and that any image, typeface, illustration, or mark has permission for the planned use. A file being available online does not establish a commercial license.

Check placement against the provider's current template and note where text or artwork might be cropped. Preview colors on a screen are a useful reference but can differ from a physical item; ask the provider about its process and order a sample if a physical check is important to the decision. Do not describe a digital mockup as an inspected product.

Separate comments from approval

A useful record has four states: draft, changes requested, awaiting approval, and approved. Each comment should identify the proof version and the location of the issue. If a correction produces a new file, provide a new proof and ask for a decision on that version rather than carrying an old approval forward automatically.

For example, an imaginary tote design might have revision 02 marked “changes requested: move the title away from the edge.” Revision 03 remains “awaiting approval” until the reviewer actually confirms it. If the reviewer does not respond, do not infer approval from silence unless the parties have explicitly agreed on that process.

Close the handoff

Once the authorized reviewer confirms the exact version, save the decision and date with the proof. List any known limits, such as a screen-only color review or an untested product variant. If the provider changes the template or product, recheck whether the approved file still fits before submitting it.

Keep source files and rights information in the project record rather than attaching private credentials or customer details to the proof. The graphic design asset handover guide offers a related way to label files and permissions. An approval record improves clarity; it does not promise quality, sales, or delivery.